wood keel partition wall construction procedures Wood keel construction procedures: clean up the grass-roots floor �� line, looking for rules �� in the ground with brick, cement mortar to do pillow (also known as kick) Line to the ceiling and the main structure of the wall �� vertical frame wall �� installed along the ground, along the top of the flute �� stand off the keel �� nail cross keel �� cover panel, set the socket location and set the reinforcement pad wood
cover panel treatment. 2, wood keel partition wall construction specifications Wooden skeleton should use specifications for the 40 mm �� 70 mm red, from the pine. The distance between the keel should be considered the size of the cover panel, usually between 450 to 600 mm? If there is a door, both sides should establish a vertical keel. The dragon keel should be connected with the lordel open rod, the window on the bottom and the top of the door should be
installed along the horizontal keel installed along the ground, along the top of the wood Leng, the corduroy should be at both ends into the brick wall at least l20 mm, To ensure that the partition wall and the original structure of the wall connected firmly. Partition panel cover can be installed with light steel keel panel installation method. 3, wood keel partition wall of the acceptance of wood keel partition wall inspection standards: cut the size of the correct, consistent
discount engineered wood flooring
pressed tin ceiling tiles
outdoor antislip fiberglass floor panel
Czytaj główny temat